OEM and Engineering Project Review
Prepare the interfaces, site conditions and acceptance requirements needed before specifying a separator or screw press.
Before equipment selection
Share the feed and discharge interfaces, a layout or available footprint, site electrical supply, upstream flow variation and required maintenance access.
Before approval and handover
Confirm the complete model, supply scope, drawing revision, test conditions and how acceptance results will be measured. Identify who is responsible for installation and commissioning.