Cocopeat and Coir Dewatering

Find a screw press

Find your starting point in 3 questions

1. What are you pressing?
2. Where does water enter?
3. What follows pressing?

From feed to separated streams

  1. Wash or soak coir

    Record free water, bulk density and fibre length.

  2. Buffer and test pressing

    Check bridging, drainage and the target outlet condition.

  3. Transfer to the next stage

    Match discharge to drying, storage or packing and collect press liquor.

Why separate solids and liquid?

Removing excess water can help prepare coir or pith for drying and onward handling. Confirm the process with the actual fibre length and moisture range.

Check what to include in a material trial

Explore the HTYZ Series

Compare the available screw presses. Confirm model suitability with your actual feed and target discharge condition.

Discuss your material with HUATAO